Community Service

Community Service: Welcome
WhatsApp Image 2019-06-28 at 7.10.31 PM.
Community Service: Image

Progress 1

Community Service: Text

Door & Window

-Repaint the ones that reusable & fix it back
-Sand off the uneven surface and the previous painting of the old wooden window
-colour used : Blue (Depends on the wall design)
- apply the window lock

Community Service: Text

meeting 1

Door & Window

The first meeting all the group present what they want to do. The meeting held for about 5 hours to complete. For my group which is window and door, my group and group 3 need to choose the color that we will choose for the window and the door and discuss about the lock that we will apply to the window. At the end of the discussion we decided that the outer part of the window will be dark blue as for the inner part will be light grey.

Community Service: Text
Community Service: Services
window lock.jpg

Replace the window lock

progress 1 pdf

pdf file

klik here

Community Service: Files

preparation

After the meeting 1 was done we decide to divided our work and I become the secretary so every bill that related to this project I keep it to give it to the main secretary of the group beside that I and Caroline will go to the site on 1st of june so the day before we make sure all of the things that we need is already prepare.


26 Mei

Me and Caroline decide to discuss about the glue that we will use to attach the cork board to the window wood. That day also we decide to buy it because we bought it online so it need time for shipping .


31 Mei

The day before I and caroline go to the mall to but the brush and some of the lock (16 upper lock and 11 side lock). before that we also already bought the brush

Community Service: Text
Community Service: Gallery

1st June

At the day we decide to go the the site at 9 in the morning and we manage to arrive at the site at around 10 am. After we arrive and see it we realize that the site is very dirty so we need to clean it up first. The first thing that i did was remove all the books and also the drawer that they had because it need to be remove beside that i also helped to remove the floor mat. and its take around 3 hours to complete it. Because i'm responsible for the interior door and window so we clean it first with the scrub and broom with the cleansing liquid. But it's not that easy the dirt is so thick so we need much time to make it totally clean as u can see at the photos beside, from my group only me and Caroline that were going for the 1st phase. At the end we manage to clean all the window and the door around 2 pm. After that we took 20 minutes break to eat and rest and continue to work from 2 30 pm until 6 we manage to do the window and door coating and we also help to coating the wall. At that day there was an accident which is 1 of the window was broken so we took several photos of the measurement to replace it with the new piece of wood. we manage to reach taylor's university at 7 30 pm.

Community Service: Text
Community Service: Gallery
WhatsApp Image 2019-06-28 at 8.01.02 PM(
Community Service: Image

14 June

This is the day before the phase 2 go to the site at that day Silviena and Stella already bought the cork board so they start to cut it because it is in A1 size while I and Caroline go to the mall and buy the paint roller and paint tray while my other friend, Sylvia fine the rest of the 5 side lock that we needed. We also brief Stella and Silviena what they need to do in order to complete the task. That day me and my friend also went to the carpenter to asked for the leftover wood that can we use to replace the broken part of the window and ask for the better solution. Luckily we get the leftover wood and its in good condition.

​

15 June

I was being call by Stella because see want to make sure about the placing of the lock because we make changes about the playing for the side lock. When I see on the site it's was unexpected that the side that we want tio place the lock is cannot be place their due to the wood frame curve.

​

The result they manage to complete to paint all the window and apply some of the side lock and also fixing the broken window

Community Service: Text

22 June

Launching Day

Previous my group that went for phase 2 didn't complete the task so, me and some of the member need to come again to finish all the leftover task. 

​

21 June

The day before we go to the site we really need to make sure that everything that we need to complete the task is ready. At that day we had some problem all our things were on JV car's and he had the trip so at the end we need to take it from their parents. That day at 3 pm it's raining and we need to grab delivery the things that we need for tommorrow but no one would take it because the distance is to far and also it's raining. At the end we decide to book grab car and ask the driver if he want to delivery only the item without instead of person and he ask for extra 10 RM. We decide to accept the offer because we had no time. All of the things was delivered to my place and i receive it at 5 15 pm. 

​

22 June (The day)

I and Stella decided to went there ealier because we still had many things to do we depart from our school at 8 45 am  and we arrived at the site at 10 am due to the rain. As we arrived there we took out all of the thing and we decided to done the cork board first we cut all of the cork board to the right size and also glue it to the window and we realize all the lock was place wrongly. Because the rest of my group still not yet go to the site we manage to call them and asked them to bring few things that we think can help to finish up our works like bring extra screw driver. The rest of our group arrive at 11 pm and we rushup to took out all the lock that been placed wrong and also ask the other member to apply all the upper lock first. The launching start at 2 pm and as expected we didn't finish all our job but we manage to apply all the upper lock make the hole and reamove all of the side lock and place it in the right side but still we need to make a hole. So after the launching ceremony was done we continue our work because its nearly done. Around 4 pm I and Stella decided to go home.

Community Service: Text
Community Service: Gallery

Bills

Because i'm the secretary so i'm the one who keep the receipt and this is all the receipt of my group spent for this activity.

​

Details

16 side lock (3.68 RM) --> 58.88 RM

16 upper lock (2.08 RM) --> 33.28 RM

9 Cork board glue (2.6 RM) + shipping --> 34.43 RM

Brush set --> 13.5 RM

8 A1 cork board --> 152 RM

3 masking tape --> 7.5 RM

paint roller and tray --> 17.8 RM

2 Drill  --> provide by own

Paint --> sponsor

Community Service: Gallery

Conclussion

From this activity i learn much about how to work on site. Before i never use any drill and such things but from this activity i can did many things that i never do before beside i really learn how to be responsible even though when i went for the phase 1 there were many problems and even though only 2 people that need to finish cleaning and coating we manage to done our job well by not taking much break and work without having break to see my phone to finish the job. It's make me turn into a better person and more care to our community .